(Breaks through the reinforced concrete pad, leaving a deep pit)

类别: CONSTRUCT
Difficulty: (construction)
耗时: 80 m 分钟
需要地形: . 强化混凝土地板(半成品)
产品: . 泥土地

查看 JSON
{
    "type": "construction",
    "id": "constr_remove_t_strconc_floor_halfway",
    "group": "remove_reinforced_concrete_floor",
    "\/\/": "Breaks through the reinforced concrete pad, leaving a deep pit",
    "category": "CONSTRUCT",
    "required_skills": [
        [
            "fabrication",
            5
        ]
    ],
    "time": "80 m",
    "using": [
        [
            "concrete_removal_standard",
            1
        ],
        [
            "metal_removal_standard",
            1
        ]
    ],
    "byproducts": "concrete_deconstruction_results",
    "pre_terrain": "t_strconc_floor_halfway",
    "post_terrain": "t_dirt",
    "repo_id": 7513,
    "original_id": "constr_remove_t_strconc_floor_halfway"
}